The works to the second floor at progressing well. The rooms have been emptied (which was quite a task with all the resources and school equipment dating back many years!) and stripped back. The corridor skirting has been removed and the ceiling taken down so that we can have a higher more spacious corridor. All the wires have then been moved to accommodate this. Ceilings have also been taken down in the Support Room and Year 6, where we have also demolished the cupboards to make better use of this space. We are glad the temperatures have dropped as it has been very hot work!